{"id":2361,"date":"2025-09-05T00:05:41","date_gmt":"2025-09-05T07:05:41","guid":{"rendered":"https:\/\/kiemtoan.man.net.vn\/?p=2361"},"modified":"2025-12-23T02:27:20","modified_gmt":"2025-12-23T09:27:20","slug":"khoa-hoc-kiem-toan-quyet-toan","status":"publish","type":"post","link":"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/","title":{"rendered":"Practical project audit and settlement course with real-world documentation."},"content":{"rendered":"<p>In the context of increasingly stringent regulations on public investment management and construction costs, mastering project settlement and payment procedures is not only a mandatory requirement but also a significant competitive advantage for personnel in the construction industry. This project settlement and payment audit course is designed to address this practical challenge, helping students transform dry theory into proficient document handling skills through a structured training system.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_76 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Index<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Gioi_thieu_ve_khoa_hoc_kiem_toan_quyet_toan_du_an\" >Introduction to the Project Finalization Auditing Course<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Loi_ich_khi_tham_gia_khoa_hoc_kiem_toan_quyet_toan_du_an_cap_nhat_moi\" >Benefits of participating in the updated project settlement audit course.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Doi_tuong_phu_hop_tham_gia_chuong_trinh_dao_tao_khoa_hoc_kiem_toan_quyet_toan_du_an\" >Suitable candidates for the project final audit training course include:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Lo_trinh_dao_tao_kiem_toan_quyet_toan_du_an_chuyen_sau\" >Advanced training program for project final settlement auditing.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Cac_thanh_phan_dao_tao_cot_loi_trong_khoa_hoc\" >The core training components in the course.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Thuc_hanh_nghiep_vu_tren_ho_so_du_an_thuc_te\" >Practice using real project documents.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Tieu_chi_lua_chon_dia_chi_dao_tao_kiem_toan_quyet_toan_du_an_uy_tin\" >Criteria for selecting a reputable training institution for project audit and settlement.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/kiemtoan.man.net.vn\/en\/khoa-hoc-kiem-toan-quyet-toan\/#Ket_qua_dat_duoc_sau_khoa_hoc\" >Results achieved after the course<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Gioi_thieu_ve_khoa_hoc_kiem_toan_quyet_toan_du_an\"><\/span>Introduction to the Project Finalization Auditing Course<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"attachment_4225\" aria-describedby=\"caption-attachment-4225\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4225\" src=\"https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Khoa-hoc-kiem-toan-quyet-toan-du-an-thuc-hanh-ho-so-thuc-te.jpg\" alt=\"Kho\u0301a ho\u0323c kie\u0302\u0309m toa\u0301n quye\u0302\u0301t toa\u0301n du\u031b\u0323 a\u0301n thu\u031b\u0323c ha\u0300nh ho\u0302\u0300 so\u031b thu\u031b\u0323c te\u0302\u0301\" width=\"800\" height=\"500\" srcset=\"https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Khoa-hoc-kiem-toan-quyet-toan-du-an-thuc-hanh-ho-so-thuc-te.jpg 800w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Khoa-hoc-kiem-toan-quyet-toan-du-an-thuc-hanh-ho-so-thuc-te-300x188.jpg 300w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Khoa-hoc-kiem-toan-quyet-toan-du-an-thuc-hanh-ho-so-thuc-te-768x480.jpg 768w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Khoa-hoc-kiem-toan-quyet-toan-du-an-thuc-hanh-ho-so-thuc-te-18x12.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-4225\" class=\"wp-caption-text\">Practical project audit and settlement course with real-world documentation.<\/figcaption><\/figure>\n<p>The Project Finalization Auditing Course is an intensive training program focusing on the process of inspecting, reviewing, and determining the finalized investment value of completed construction projects. In the context of public investment management being implemented under a strict post-audit mechanism, this course provides the mindset of a professional auditor. This enables participants to independently, objectively, and compliantly review project documentation.<\/p>\n<p>The core difference between project settlement auditing and pure construction accounting or quantity surveying (QS) engineering lies in the overall perspective. While QS engineers focus on quantities and unit prices according to the contract, and accountants focus on invoices and supporting documents, project settlement auditors must connect both of these elements with the current legal system. Standardizing the skills in preparing settlement documentation helps construction industry personnel feel more confident when facing inspections or working with state audit agencies.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Loi_ich_khi_tham_gia_khoa_hoc_kiem_toan_quyet_toan_du_an_cap_nhat_moi\"><\/span>Benefits of participating in the updated project settlement audit course.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Participating in a continuously updated training program offers practical value that is difficult to achieve through self-study. Trainees will gain access to the current version of legal documents on cost management and construction contracts. This helps businesses and individuals minimize legal risks that could lead to unnecessary disallowances or administrative penalties.<\/p>\n<p>Beyond providing knowledge, the course also serves as a crucial bridge to narrow the gap between academic theory at university and the practical demands of businesses. Upon completion, students not only enhance their professional skills but also open up opportunities for increased income and advancement to management positions in project management boards, reputable auditing firms, or large construction corporations.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Doi_tuong_phu_hop_tham_gia_chuong_trinh_dao_tao_khoa_hoc_kiem_toan_quyet_toan_du_an\"><\/span>Suitable candidates for the project final audit training course include:<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"attachment_4224\" aria-describedby=\"caption-attachment-4224\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4224\" src=\"https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Doi-tuong-phu-hop-tham-gia-chuong-trinh-dao-tao-khoa-hoc-kiem-toan-quyet-toan-du-an.jpg\" alt=\"\u0110o\u0302\u0301i tu\u031bo\u031b\u0323ng phu\u0300 ho\u031b\u0323p tham gia chu\u031bo\u031bng tri\u0300nh \u0111a\u0300o ta\u0323o kho\u0301a ho\u0323c kie\u0302\u0309m toa\u0301n quye\u0302\u0301t toa\u0301n du\u031b\u0323 a\u0301n\" width=\"800\" height=\"500\" srcset=\"https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Doi-tuong-phu-hop-tham-gia-chuong-trinh-dao-tao-khoa-hoc-kiem-toan-quyet-toan-du-an.jpg 800w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Doi-tuong-phu-hop-tham-gia-chuong-trinh-dao-tao-khoa-hoc-kiem-toan-quyet-toan-du-an-300x188.jpg 300w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Doi-tuong-phu-hop-tham-gia-chuong-trinh-dao-tao-khoa-hoc-kiem-toan-quyet-toan-du-an-768x480.jpg 768w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Doi-tuong-phu-hop-tham-gia-chuong-trinh-dao-tao-khoa-hoc-kiem-toan-quyet-toan-du-an-18x12.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-4224\" class=\"wp-caption-text\">Suitable candidates for the project settlement audit training course include:<\/figcaption><\/figure>\n<p>This training program is designed to be flexible and suitable for a wide range of stakeholders within the construction and finance ecosystem:<\/p>\n<ul>\n<li>Final-year students majoring in Construction Economics and Construction Management are seeking practical skills to prepare for graduation and quickly enter the workforce.<\/li>\n<li>Field engineers and Quantity Surveyors (QS) are looking to transition into areas such as cost control, budget verification, or in-depth preparation of final accounts.<\/li>\n<li>Construction accountants want to enhance their knowledge of reading and understanding blueprints, managing quantities, and specific regulations regarding project unit prices in order to effectively coordinate with the engineering department.<\/li>\n<li>Officials working in project management boards or construction companies often have to work directly with state inspection and auditing agencies.<\/li>\n<li>Construction business leaders want to understand the process to control cash flow and optimize project profits through accurate settlement of accounts.<\/li>\n<\/ul>\n<p>However, to ensure the quality of training, the course may <strong>unsuitable<\/strong> with the following subjects:<\/p>\n<ul>\n<li>Those seeking a certification to enhance their resume but with no intention of practicing or conducting in-depth research on project portfolios.<\/li>\n<li>This course is suitable for individuals without a basic background in construction or construction accounting, as it goes straight into specialized and practical operations.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Lo_trinh_dao_tao_kiem_toan_quyet_toan_du_an_chuyen_sau\"><\/span>Advanced training program for project final settlement auditing.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure id=\"attachment_4223\" aria-describedby=\"caption-attachment-4223\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4223\" src=\"https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Cac-thanh-phan-chinh-trong-chuong-trinh-dao-tao-kiem-toan-xay-dung.jpg\" alt=\"Ca\u0301c tha\u0300nh pha\u0302\u0300n chi\u0301nh trong chu\u031bo\u031bng tri\u0300nh \u0111a\u0300o ta\u0323o kie\u0302\u0309m toa\u0301n xa\u0302y du\u031b\u0323ng\" width=\"800\" height=\"500\" srcset=\"https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Cac-thanh-phan-chinh-trong-chuong-trinh-dao-tao-kiem-toan-xay-dung.jpg 800w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Cac-thanh-phan-chinh-trong-chuong-trinh-dao-tao-kiem-toan-xay-dung-300x188.jpg 300w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Cac-thanh-phan-chinh-trong-chuong-trinh-dao-tao-kiem-toan-xay-dung-768x480.jpg 768w, https:\/\/kiemtoan.man.net.vn\/wp-content\/uploads\/2025\/09\/Cac-thanh-phan-chinh-trong-chuong-trinh-dao-tao-kiem-toan-xay-dung-18x12.jpg 18w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-4223\" class=\"wp-caption-text\">Key components of a construction audit training program.<\/figcaption><\/figure>\n<p>To ensure that trainees can immediately grasp and apply the knowledge in practice, the training program is structured as a &quot;hands-on&quot; approach through the following systematic steps:<\/p>\n<ul>\n<li>Stage 1: Standardizing legal thinking. Focus on reading, understanding, and applying the current system of Decrees and Circulars on construction cost management and contracts.<\/li>\n<li>Stage 2: Project Legal Document Review Skills. Learn how to check the completeness and validity of approval documents, bidding documents, and acceptance reports.<\/li>\n<li>Stage 3: Practice controlling quantities and unit prices. Use actual records to break down and compare quantities and verify the correctness of applying unit prices according to regulations.<\/li>\n<li>Stage 4: Handling arising issues and protecting data. Practice preparing on-site handling reports and developing presentation skills to defend settlement results before relevant parties.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Cac_thanh_phan_dao_tao_cot_loi_trong_khoa_hoc\"><\/span>The core training components in the course.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The program not only provides knowledge but also includes professional support tools for students:<\/p>\n<ul>\n<li>Theoretical lectures: Compiled concisely, focusing only on legal provisions that directly affect auditing and settlement procedures.<\/li>\n<li>The actual project documentation system includes as-built drawings, contracts, acceptance reports, and final settlement statements for completed projects.<\/li>\n<li>Specialized template library: Provides sample Excel calculation files, standard report templates, and verification report templates in accordance with the latest regulations.<\/li>\n<li>Online discussion forum: A place where instructors and students can exchange ideas about difficult situations and common problems in audit records that lead to audit rejections.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Thuc_hanh_nghiep_vu_tren_ho_so_du_an_thuc_te\"><\/span>Practice using real project documents.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Below is a comparison table of the actual tasks that trainees will perform in the practical session to understand the difference between a standard and a flawed document:<\/p>\n<table style=\"width: 100%; border-color: #000000;\" border=\"1\" cellspacing=\"2\" cellpadding=\"12\">\n<tbody>\n<tr>\n<th style=\"text-align: center;\">Practical category<\/th>\n<th style=\"text-align: center;\">Details of the work performed<\/th>\n<th style=\"text-align: center;\">Objectives achieved<\/th>\n<\/tr>\n<tr>\n<td>Check legal documents<\/td>\n<td>Review the legality of contracts, approval decisions, and construction logs.<\/td>\n<td>Determine the legal validity and reliability of the project.<\/td>\n<\/tr>\n<tr>\n<td>Compare the quantities.<\/td>\n<td>Match the design quantities, completed quantities, and final settlement statement.<\/td>\n<td>Eliminate fictitious values or errors in calculations.<\/td>\n<\/tr>\n<tr>\n<td>Price verification<\/td>\n<td>Verify that the unit prices applied are in accordance with the contract and local regulations.<\/td>\n<td>Ensure that expenses do not exceed the allocated budget or violate regulations.<\/td>\n<\/tr>\n<tr>\n<td>Handling arising issues<\/td>\n<td>Review the cost estimate and related site reports.<\/td>\n<td>Control the accuracy of off-contract expenses.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Note: The data and practice records are based on real-world projects that have been processed by the instructor to maintain confidentiality while preserving the complexity of the actual work. A typical example is the detection of errors in applying the standard cost code for wooden pile driving, resulting in savings of hundreds of millions of VND for the project budget after reviewing the actual completed work volume.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Tieu_chi_lua_chon_dia_chi_dao_tao_kiem_toan_quyet_toan_du_an_uy_tin\"><\/span>Criteria for selecting a reputable training institution for project audit and settlement.<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>With so many training centers available today, learners need to be discerning in choosing a reputable institution to ensure the value of the certificate and knowledge they receive.<\/p>\n<p>The first criterion is that the curriculum must be practical and regularly updated to reflect changes in the law. The teaching staff should consist of leading experts with direct experience in handling cost control periods. Choosing institutions with strong professional networks like MAN \u2013 Master Accountant Network will help students not only gain knowledge but also join a community of top professionals in finance, accounting, and construction auditing.<\/p>\n<p>The Master Accountant Network (MAN) is a hub for practical professionals, offering standardized training programs and high-quality job opportunities in project audit and settlement. Joining this community provides students with knowledge support even after completing their courses.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Ket_qua_dat_duoc_sau_khoa_hoc\"><\/span>Results achieved after the course<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Upon completing the project settlement audit course, participants will possess the core competencies necessary for a sustainable career development:<\/p>\n<ul>\n<li>Proficient in preparing, reviewing, and defending project completion settlement documents in accordance with current regulations.<\/li>\n<li>Confidently take on the role of project auditor or payment\/settlement specialist at large enterprises and project management boards.<\/li>\n<li>Expand your network through the mentorship and professional support of MAN \u2013 Master Accountant Network.<\/li>\n<\/ul>\n<p>According to reports from construction industry human resources forums, personnel with advanced auditing and settlement skills tend to earn significantly higher incomes than the average. Investing in a quality course is a strategic step to solidify your position and future career in the construction industry.<\/p>","protected":false},"excerpt":{"rendered":"<p>Trong b\u1ed1i c\u1ea3nh c\u00e1c quy \u0111\u1ecbnh v\u1ec1 qu\u1ea3n l\u00fd \u0111\u1ea7u t\u01b0 c\u00f4ng v\u00e0 chi ph\u00ed x\u00e2y d\u1ef1ng ng\u00e0y c\u00e0ng si\u1ebft ch\u1eb7t, vi\u1ec7c n\u1eafm v\u1eefng nghi\u1ec7p v\u1ee5 thanh quy\u1ebft to\u00e1n kh\u00f4ng ch\u1ec9 l\u00e0 y\u00eau c\u1ea7u b\u1eaft bu\u1ed9c m\u00e0 c\u00f2n l\u00e0 l\u1ee3i th\u1ebf c\u1ea1nh tranh l\u1edbn cho nh\u00e2n s\u1ef1 ng\u00e0nh x\u00e2y d\u1ef1ng. Kh\u00f3a h\u1ecdc ki\u1ec3m to\u00e1n quy\u1ebft [&hellip;]<\/p>","protected":false},"author":2,"featured_media":4225,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-2361","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-dao-tao"],"acf":[],"_links":{"self":[{"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts\/2361","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/comments?post=2361"}],"version-history":[{"count":3,"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts\/2361\/revisions"}],"predecessor-version":[{"id":4226,"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/posts\/2361\/revisions\/4226"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/media\/4225"}],"wp:attachment":[{"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/media?parent=2361"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/categories?post=2361"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kiemtoan.man.net.vn\/en\/wp-json\/wp\/v2\/tags?post=2361"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}